JADUAL KURSUS INDUSTRIAL INSTRUMENTATION & CONTROL OPERATION AND MAINTENANCE LEVEL 3, SESI 1-2022(SABTU , 8.00 PAGI - 5.00 PETANG)
MODUL |
TASK |
INSTRUCTOR |
DATE |
TIME |
CU1 : INSTRUMENTATION & CONTROL SAFETY APPLICATION |
Assess instrumentation & control safety procedure |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
- Apply Basic Electrical Instrument Component |
||||
- Apply Basic Mechanical Instrument Component |
||||
Check instrumentation & control work area safety |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
|
Check safety of instrumentation & control equipment Handling |
||||
Check Safety of instrumentation & control equipment operational. |
||||
- HIRAC, Smoke, heat, uv/IR and Gas detector |
AZURA HANI BINTI HAMDAN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Fire Alam Panel and Break Glass |
||||
CU2 : INSTRUMENTATION & CONTROL OPERATION |
Prepare instrumentation & control operational safety report |
WAN NAZLI BIN ABDUL HAMID |
|
8.00am - 5.00pm ( 8 Hour ) |
- Pressure, Temperature, Level, Flow and Limit Switch |
||||
Identify instrument & control operational requirements |
||||
- Carry Out Controller Function & Carry Out Control Loop Check |
||||
Carry out instrument & control operation |
WAN NAZLI BIN ABDUL HAMID |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Carry Out Control Loop Logic Function Check, |
||||
Monitor instrument & control equipment operation |
||||
-Evaluate Process Characteristics Data, P&ID and Loop Drawing |
||||
Rectify operation malfunction |
WAN NAZLI BIN ABDUL HAMID |
|
8.00am - 5.00pm ( 8 Hour )) |
|
- Carry Out Process Loop Tunning |
||||
Prepare Instrumentation & Control Operational Report |
||||
- Carry Out Cascade and Override Loop Parameter |
||||
- Carry Out Feedback and Feedforward Loop Parameter |
||||
CU3 : INSTRUMENTATION AND CONTROL PRECOMMISSIONING PREPARATION INSTRUMENT CALIBRATION |
Interpret instrument & control pre-commissioning requirements |
AZURA HANI BINTI HAMDAN |
|
8.00am - 5.00pm ( 8 Hour ) |
Perform Instrument Installation |
||||
Perform instrument pre-commissioning |
||||
Asses Installed Instrument Operational Performance |
||||
Prepare Instrument Pre-commissioning Report |
||||
- Perform pH Analyzer Calibration |
||||
- Perform EC Analyzer Calibration |
||||
CU4 : INSTRUMENTATION & CONTROL MAINTENANCE AND TROUBLESHOOTING |
Study instrument & control maintenance requirements |
SUZANA BINTI SURADI |
|
8.00am - 5.00pm ( 8 Hour ) |
- Carry Out Air Filter, Air Regulator and Air Filter Regulatotr Maintenance |
||||
Perform instrument & control preventive maintenance activities |
SUZANA BINTI SURADI |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Carry Out Electronic Recorder Operation |
||||
Perform instrument & control corrective maintenance activities |
SUZANA BINTI SURADI |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Overhaull Control Valve, Lapping, Leak Test |
SUZANA BINTI SURADI |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Perform Actuator bench Set and Calibrate Electro-Pneumatic Positioner |
MODUL |
TASK |
INSTRUCTOR |
DATE |
TIME |
CU5 : INSTRUMENTATION VERIFICATION AND CALIBRATION |
Perform instrument & control trouble-shooting activities |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
Prepare instrument & control maintenance and trouble-shooting report |
||||
- Perform Air Drayer Maitenance , Perform Air Compressor Maintenance |
||||
Access Instrumentation Verification and Calibration Requirement |
NOORZILAH BINTI JAMALUDDIN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
-Carry out Current to Pneumatic and Pneumatic to Current Converter |
||||
- Carrey Out Solenoid Valve Servicing |
||||
Perform Instrument Calibration And Verification |
NOORZILAH BINTI JAMALUDDIN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Carry Out Pressure Gauge Calibration and Tubing |
||||
Record Instrument Verification And Calibration |
NOORZILAH BINTI JAMALUDDIN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Carry Out Pressure Transmitter Calibration and Troubleshooting |
||||
- Carry Out Temperature Transmitter Calibration and Troubleshooting |
||||
- Carry Out Level Transmitter Calibration and Troubleshooting |
NOORZILAH BINTI JAMALUDDIN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Carry Out Flow Transmitter Calibration and Troubleshooting |
||||
CU6 : CONTROL SYSTEM CONFIGURATION |
Assess control system configuration requirement |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
-Maintain Distributed Control syste, (DCS) |
||||
Perform control system configuration work |
||||
Prepare control system configuration report |
||||
- Perform PLC overview and Conduct PLC Hardware |
||||
- Perform PLC upload and dwnload PLC program |
||||
CU7 : INSTRUMENTATION & CONTROL SUPERVERSORY |
Execute professional development programme |
AZURA HANI BINTI HAMDAN |
|
8.00am - 5.00pm ( 8 Hour ) |
Assess potential risk |
||||
Observe maintenance activities |
AZURA HANI BINTI HAMDAN |
|
8.00am - 5.00pm ( 8 Hour ) |
|
Perform inventory control |
||||
Execute procurement activities |
||||
CU7B : PNEUMATIC & HYDRAULIC SYSTEM |
- Produce Pneumatic/Hydraulic Drawing |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
- Check Pneumatic/Hydraulic Performance |
||||
- Troubleshoot Pneumatic/Hydraulic Part |
||||
- Makluman SKM PP, Pendaftaran dan Pembangunan portfolio SKM |
||||
10C : ELECTRIC MACHINES |
Perform DC Motor Control |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
- Interpret schematic diagrams and Interpret wiring diagram. |
||||
Perform AC Motor Control |
MOHD HISHAM BIN ABD JALIL |
|
8.00am - 5.00pm ( 8 Hour ) |
|
- Ability to select motor starter and regulation |
PENGESAHAN |
Adalah disahkan bahawa kesemua modul diatas menepati kehendak NOSS dengan maksud tujuan pelaksanaan SKM 3 secara Pencapaian Pentauliahan Terdahulu (PPT). Kelas dilaksanakan secara separuh masa iaitu setiap hari Sabtu di ILP Pasir Gudang |