| Jadual Kursus Jangka Pendek Instrumen Perindustrian | ||||
| Kelas 2 Sesi 2022/2023 (Sabtu, 8:00 pagi-5:00 petang) | ||||
| MODUL | TASK | INSTRUCTOR | DATE | TIME |
| CU1: INSTRUMENTATION & CONTROL SAFETY APPLICATION | Assess instrumentation & control safety procedure | MOHD HISHAM BIN ABD JALIL | 8.00am - 5.00pm (8 Hours) |
|
| - Apply Basic Electrical Instrument Component | ||||
| - Apply Basic Mechanical Instrument Component | ||||
| Check instrumentation & control work area safety | MOHD HISHAM BIN ABD JALIL | 8.00am - 5.00pm (8 Hours) |
||
| Check safety of instrumentation & control equipment Handling | ||||
| Check Safety of instrumentation & control equipment operational. | ||||
| - HIRARC, Smoke, heat, uv/IR and Gas detector | SUZANA BINTI SURADI | 8.00am - 5.00pm (8 Hours) |
||
| - Fire Alarm Panel and Break Glass | ||||
| CU2: INSTRUMENTATION & CONTROL OPERATION | Prepare instrumentation & control operational safety report | WAN NAZLI BIN ABDUL HAMID | 8.00am - 5.00pm (8 Hours) |
|
| - Pressure, Temperature, Level, Flow and Limit Switch | ||||
| Identify instrument & control operational requirements | ||||
| - Carry Out Controller Function & Carry Out Control Loop Check | ||||
| Carry out instrument & control operation | WAN NAZLI BIN ABDUL HAMID | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Control Loop Logic Function Check, | ||||
| Monitor instrument & control equipment operation | ||||
| -Evaluate Process Characteristics Data, P&ID and Loop Drawing | ||||
| Rectify operation malfunction | WAN NAZLI BIN ABDUL HAMID | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Process Loop Tuning | ||||
| Prepare Instrumentation & Control Operational Report | ||||
| - Carry Out Cascade and Override Loop Parameter | ||||
| - Carry Out Feedback and Feedforward Loop Parameter | ||||
| CU3: INSTRUMENTATION AND CONTROL PRECOMMISSIONING PREPARATION INSTRUMENT CALIBRATION | Interpret instrument & control pre-commissioning requirements | NOORZILAH BINTI JAMALUDIN | 8.00am - 5.00pm (8 Hours) |
|
| Perform Instrument Installation | ||||
| Perform instrument pre-commissioning | ||||
| Asses Installed Instrument Operational Performance | ||||
| Prepare Instrument Pre-commissioning Report | ||||
| - Perform pH Analyzer Calibration | ||||
| - Perform EC Analyzer Calibration | ||||
| CU4: INSTRUMENTATION & CONTROL MAINTENANCE AND TROUBLESHOOTING | Study instrument & control maintenance requirements | SUZANA BINTI SURADI | 8.00am - 5.00pm (8 Hours) |
|
| - Carry Out Air Filter, Air Regulator and Air Filter Regulator Maintenance | ||||
| Perform instrument & control preventive maintenance activities | SUZANA BINTI SURADI | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Electronic Recorder Operation | ||||
| Perform instrument & control corrective maintenance activities | SUZANA BINTI SURADI | 8.00am - 5.00pm (8 Hours) |
||
| - Overhaul Control Valve, Lapping, Leak Test | SUZANA BINTI SURADI | 8.00am - 5.00pm (8 Hours) |
||
| - Perform Actuator bench Set and Calibrate Electro-Pneumatic Positioner | ||||
| MODUL | TASK | INSTRUCTOR | DATE | TIME |
| CU5: INSTRUMENTATION VERIFICATION AND CALIBRATION | Perform instrument & control trouble-shooting activities | MOHD HISHAM BIN ABD JALIL | 8.00am - 5.00pm (8 Hours) |
|
| Prepare instrument & control maintenance and trouble-shooting report | ||||
| - Perform Air Dryer Maintenance, Perform Air Compressor Maintenance |
||||
| Access Instrumentation Verification and Calibration Requirement | NOORZILAH BINTI JAMALUDIN | 8.00am - 5.00pm (8 Hours) |
||
| -Carry out Current to Pneumatic and Pneumatic to Current Converter | ||||
| - Carrey Out Solenoid Valve Servicing | ||||
| Perform Instrument Calibration and Verification | NOORZILAH BINTI JAMALUDIN | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Pressure Gauge Calibration and Tubing | ||||
| Record Instrument Verification and Calibration | NOORZILAH BINTI JAMALUDIN | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Pressure Transmitter Calibration and Troubleshooting | ||||
| - Carry Out Temperature Transmitter Calibration and Troubleshooting | ||||
| - Carry Out Level Transmitter Calibration and Troubleshooting | NOORZILAH BINTI JAMALUDIN | 8.00am - 5.00pm (8 Hours) |
||
| - Carry Out Flow Transmitter Calibration and Troubleshooting | ||||
| CU6: CONTROL SYSTEM CONFIGURATION | Assess control system configuration requirement | MOHD HISHAM BIN ABD JALIL | 8.00am - 5.00pm (8 Hours) |
|
| -Maintain Distributed Control system, (DCS) | ||||
| Perform control system configuration work | ||||
| Prepare control system configuration report | ||||
| - Perform PLC overview and Conduct PLC Hardware | ||||
| - Perform PLC upload and download PLC program | ||||
| CU7: INSTRUMENTATION & CONTROL SUPERVISORY | Execute professional development programme | NOR HASLINDA BINTI IBRAHIM | 8.00am - 5.00pm (8 Hours) |
|
| Assess potential risk | ||||
| Observe maintenance activities | NOR HASLINDA BINTI IBRAHIM | 8.00am - 5.00pm (8 Hours) |
||
| Perform inventory control | ||||
| Execute procurement activities | ||||
| CU7B: PNEUMATIC & HYDRAULIC SYSTEM | - Produce Pneumatic/Hydraulic Drawing | MOHD HISHAM BIN ABD JALIL | 8.00am - 5.00pm (8 Hours) |
|
| - Check Pneumatic/Hydraulic Performance | ||||
| - Troubleshoot Pneumatic/Hydraulic Part | ||||
| - Makluman SKM PP, Pendaftaran dan Pembangunan portfolio SKM | ||||
| 10C: ELECTRIC MACHINES | Perform DC Motor Control | RAMLI BIN KOSNI | 8.00am - 5.00pm (8 Hours) |
|
| - Interpret schematic diagrams and Interpret wiring diagram. | ||||
| Perform AC Motor Control | RAMLI BIN KOSNI | 8.00am - 5.00pm (8 Hours) |
||
| - Ability to select motor starter and regulation | ||||
| Pengesahan | ||||
| Adalah disahkan bahawa semua modul di atas menepati kehendak NOSS dengan maksud tujuan pelaksanaan SKM3 secara | ||||
| Pencapaian Pentauliahan Terdahulu (PPT). Kelas dilaksanakan secara separuh masa iaitu setiap hari Sabtu di ILP Pasir Gudang | ||||
| ……………………………………………………………………………. | …………………………………………………………………. | |||
| (KETUA BAHAGIAN INSTRUMEN PERINDUSTRIAN) | (KETUA JABATAN ELEKTRIK & ELEKTRONIK) | |||
| NAMA: | NAMA: | |||
| TARIKH: | TARIKH: | |||
Maklumat Penganjuran
: Dayangku Suraya Binti Awang Jafar
: Mohd Hisham B Abd Jalil
: MOHD HISHAM BIN ABD JALIL
: BAHAGIAN INSTRUMEN PERINDUSTRIAN
: ILP Pasir Gudang